In
the early seventies, and during a visit to an oil production facility, the late
Sheikh Zayed Bin Sultan Al Nahyan noticed the flaring of associated gas into
the atmosphere and inquired how this can be stopped. This was the background
against which ADGAS was established in 1973 to become the first LNG production
company in the whole Middle East and North Africa (MENA) region. An agreement
was signed to supply LNG and LPG to the Tokyo Electric Power Company (TEPCO).
The Company started with two production trains and added a third one in 1994
with a total production of over 8 million tons of LNG, LPG, and other products.
For the past four decades, ADGAS has been the regional pioneer in LNG and LPG
production and marketing, thanks to the company’s compliance with the best
international practices in the fields of industrial reliability and integrity,
building on the history and expertise of its shareholders, ADNOC, Mitsui &
Co. Ltd., BP and Total.
Available Vacancies:
4/25/2016 - Scaffolding
Coordinator- Contract Hire
To ensure all
scaffolding required in the Live operating plant are installed safely in
accordance with the industrial standards and as per the approved PTW procedure
4/25/2016 - Concrete and
Structural Inspector- Contract Hire
To review
Quality Control Plans, Procedures, Method statements, Materials technical
submittal and ITP's prepared by the contractors
4/12/2016 - Senior Risk
Based Inspection Engineer- Contract Hire
Plans and
establishes Risk Based inspection (RBI) programs and strategies for fixed
static equipment for LNG plants and new projects utilizing RBI methodology
.
3/30/2016 - NDT (NON-DESTRUCTIVE
TESTING) SUPERVISOR-Level 3- Contract Hire
The NDT
Supervisor of Level 3 will do assessment and monitoring the condition of all
static plant equipment and piping in the LNG plant.
5/9/2016 - Rigging
Supervisor-Contract Hire
The
successful candidate must be experienced in directing, Coordinating and
controlling the activities assigned to the contractors and other employed
personnel, to ensure all rigging, lifting, operation and transportation
required for the LNG plant and associated facilties are performed safely,
according to prescribed standards of quality and at the most economic
cost.